AZO-SPEED AZO-SPEED AZO-SPEED AZO-SPEED AZO-SPEED AZO-SPEED

Azo-Speed is a ready-to-use liquid formulation containing slow release nitrogen, magnesium and sulphur.

Azo-Speed is an original formulation with a new nitrogen compound. Benefits when using Azo-Speed is a slower nitrogen release for a reduced risk of burn.

Azo-Speed combines nitrogen with a specific mineral balance. It improves the homogeneity and the quality of the harvest.

FOLIAR APPLICATION

> CEREALS - Rate: 5- 20 L/ha in 100L min of water - Timing: From flag leaf sheath opening until flowering (ear emergence).

> RICE - Rate: 5- 20 L/ha in 100L min of water - Timing: 1-2 applications at 15 – 45 – 55 days after sowing on Intensive rice

> MAIZE - Rate: 5- 20 L/ha in 200L min of water - Timing: From 4-6 leaves and 10-15 days later if necessary

> POTATO - Rate: 5- 20 L/ha 200L Before tuber initiation and at the beginning of flowering stage.

> BEETROOT - Rate: 5- 20 L/ha 100L min of water - Timing: At 4-6 leaves and a month later if necessary.

> SUNFLOWER - Rate: 5- 20 L/ha 100L min of water - Timing: From 5-6 pairs of leaves until inflorescence emergence

> FODDER BEET - Rate: 5- 10 L/ha 100L min of water - Timing: From 4-6 leaves and 1 month later if necessary

> BRASSICAS - Rate: 5- 20 L/ha 100L min of water - Timing: From 4-8 leaves then at the start of stem elongation (C1) and at the end of inflorescence emergence stage (D2).

> GRAPE - Water volume minimum 200 L/ha - Rate: 5-10L/ha Nutritional support - 2 applications from leaves unfolded stage until separated flower buds stage (before flowering) - Rate: 20 L/ha Improvement of nitrogen content of must - 2 applications around berry softening at 15-day interval - Rate: 5- 20 L/ha Postharvest: 1 application after harvest and before the beginning of leaf fall stage

> FRUIT TREES, CITRUS - Water volume minimum 500 L - Rate: 5-10 L/ha Nutritional support – 1 application before flowering (pip fruits and citrus) and/or 1 application from petal fall stage on - Rate: 5-10 L/ha Postharvest: 1 application after harvest and before the beginning of leaf fall stage.

> MANGO - Rate: 5-10 L/ha 500L min of water - Timing: 1-2 applications from fruit setting until enlargement

Get in touch with an expert